The Challenges

Provided Scaffolding & Access Services in support of Canadian Oil Sands Construction’s project to expand capacity at Enbridge’s Athabasca Tank Terminal, CWP 110 – Manifold 203:above ground piping, below ground piping, structural platforms, structural supports, installation and alignment of 2 x 450hp Booster Pumps coating and painting of all piping and structural, hydro-testing of all piping. CWP 510 – Connecting Lines, Underground 12″ line x 250 meters, Underground 16″ line x 250 meters, Coating of all piping, Risers and tie-ins to existing pig launchers. CWP 210 – Modification of Truck Unloading, Install 12″ Hot Bitumen Insulated Line,Shutdown and tie-ins.

Project Description

Client:Canadian Oil Sands Construction
Location:Enbridge's Athabasca Tank Terminal